Toronto Energy and Water Reporting: What GTA Property Managers Need to Know for 2027

Starting in 2027, thousands more Toronto buildings must report their energy and water use every year. Buildings of 10,000 to 49,999 square feet join the City of Toronto’s reporting program, with the first reports due July 2, 2027. Larger buildings already report to both the City and the Province. If you manage commercial, industrial or multi-residential property in Toronto or the GTA, this guide to Toronto energy and water reporting explains what applies to you, what is due when, and how to turn a reporting obligation into lower operating costs.

Toronto energy and water reporting: two sets of rules

Ontario (the whole province). Under Ontario Regulation 506/18, owners of buildings 50,000 sq ft and larger must report the previous year’s energy and water use to the Ministry of Energy and Mines by July 1 each year. Buildings of 100,000 sq ft and larger also need a certified professional to verify the data in their first reporting year and every five years after that. Some properties are exempt from provincial reporting, including publicly owned buildings and buildings where a large share of the space is used for manufacturing, data centres or similar uses.

City of Toronto (postal codes starting with “M”). Toronto’s Energy and Water Reporting Bylaw, Municipal Code Chapter 367, goes further:

Building sizeCity of TorontoProvince of Ontario
50,000 sq ft and largerReporting since 2024, due the first business day in JulyDue July 1 each year
10,000 to 49,999 sq ftMandatory from 2027, first deadline July 2, 2027Not required
Under 10,000 sq ftNot requiredNot required
  • The City has no ongoing exemptions by building type. Some buildings that are exempt from provincial reporting must still report to the City.
  • When a property has several owners, they are jointly responsible for filing a single report.
  • Buildings of 100,000 sq ft and larger need certified third-party verification once every five years.

If your building is in the GTA but outside Toronto, for example in Mississauga, Vaughan or Markham, the provincial rules apply when it is 50,000 sq ft or larger.

How energy and water reporting works

Both the City and the Province use ENERGY STAR Portfolio Manager, a free online tool. You enter 12 months of electricity, natural gas and water data, and the tool benchmarks your building against similar buildings.

Collecting the data is usually the hardest part, especially when tenants hold their own utility accounts. Owners can request aggregated whole-building data from the utilities. Toronto Hydro asks for requests by April 30, Enbridge fulfils requests between March 1 and June 1, and both say requests typically take about four weeks. Leave it until June and you will likely miss the deadline.

A note for condominium buildings

The bylaw’s current wording applies the size threshold to each condominium unit or common area, not to the whole building, so most condominium corporations do not have to report to the City in 2026. The City intends to recommend closing this gap and encourages condo buildings to report whole-building data voluntarily. Condo boards and property managers should plan as if reporting is coming.

What comes next: building emissions performance standards

Reporting is the first step. Toronto’s Net Zero Existing Buildings Strategy aims for net zero emissions from buildings by 2040, and the City is developing building emissions performance standards (BEPS), which would set emissions limits for existing buildings rather than only requiring reports.

BEPS has not been approved by City Council and no compliance dates are set. City staff are expected to report back to Council in early 2027, and the City has said low-rise residential buildings of up to three storeys will be exempt. The data you report now is what the City will use to design the standards, so your building’s performance today matters.

Turn reporting into savings

Benchmarking pays off on its own. The City cites U.S. EPA data showing that buildings that consistently benchmark achieve average annual energy savings of 2.4 per cent. Your Portfolio Manager score shows where your building stands; the next step is improving it.

  1. Start with the systems you already have. A building automation system with correct schedules and setpoints is often the lowest-cost way to cut energy use, and it produces the data reporting needs.
  2. Monitor continuously, not once a year. Energy management monitoring catches waste as it happens, so your next report shows the improvement.
  3. Plan equipment upgrades before they are urgent. Aging boilers and rooftop units drive both emissions and repair costs. A planned commercial HVAC retrofit lets you schedule the work, and many projects qualify for Ontario HVAC incentives.
  4. Build a long-term plan. A sustainability and decarbonization plan lines up today’s upgrades with where Toronto’s rules are heading.

Key dates at a glance

  • March 1 to June 1: Enbridge whole-building data request window
  • April 30: request Toronto Hydro whole-building data
  • July 1: provincial deadline for buildings 50,000 sq ft and larger
  • First business day in July: City of Toronto deadline for buildings 50,000 sq ft and larger
  • July 2, 2027: first City deadline for buildings of 10,000 to 49,999 sq ft
  • Early 2027: City staff report back to Council on emissions performance standards

Official sources: City of Toronto Energy and Water Reporting and Ontario: Report energy and water use in large buildings.

Frequently Asked Questions

Does my building have to report energy use in Toronto?

If it is in Toronto and 50,000 sq ft or larger, yes. You report every year to the City and to the Province. Buildings of 10,000 to 49,999 sq ft must start reporting to the City in 2027.

When is the Toronto energy reporting deadline?

July 1 for the Province and the first business day in July for the City. For Toronto buildings of 10,000 to 49,999 sq ft, the first City deadline is July 2, 2027.

What tool do I use to report?

ENERGY STAR Portfolio Manager, a free online tool used for both City of Toronto and Ontario reporting.

Do condominium buildings have to report?

For 2026, the City applies the size threshold to each unit, so most condominium buildings do not have to report. The City plans to close this gap and encourages voluntary whole-building reporting.

What are building emissions performance standards?

Proposed rules that would set emissions limits for existing Toronto buildings. They have not been approved by City Council, and City staff are expected to report back in early 2027.

How can I improve my building’s energy score?

Start with building automation controls and scheduling, add continuous energy monitoring, and plan HVAC retrofits that qualify for Ontario incentives.

Get ready for 2027

Kontrol Buildings helps Toronto and GTA property managers improve building performance with building automation, energy monitoring and planned HVAC upgrades, backed by 24/7 HVAC service and repair. Book a building review before your next report.

Next
Next

Commercial HVAC Retrofits in Toronto and the GTA: When to Upgrade, Costs and Incentives